Contract and fixed history

Issue #1754 reports a source transaction that begins during persisted hydration and commits after the hydration scope closes. A late commit must apply and settle. It must not enter a hydration buffer whose flush already ran. The existing core persistence tests cover this rule with a controlled adapter. This test adds a live Electric and OPFS host witness.

The fixed history starts with one PostgreSQL row and loads it through an on-demand Electric Collection. The test then starts a second subset demand for an absent key. It holds that demand after the OPFS subset read, while the persisted hydration scope remains active. A PostgreSQL update starts a real Electric source transaction during the hold. The fixture parks its row-bearing commit. The test releases hydration, observes the scope exit and the unchanged old row, then releases the commit. The expected new row comes from the PostgreSQL update. The test compares complete public and durable rows after the commit, after follower takeover, and after reopen.

The empty subset demand cannot deliver the updated key through its own remote snapshot. The source transaction is the only tested path for that update. The reach flags distinguish fixture setup from the reported straddle: the source began during the hold, its row commit was parked, and the hydration scope exited before the commit was released.

RED and GREEN evidence

The final test passed four focused repeats. The full live Electric suite passed twice, with 10 of 10 tests green. TypeScript, changed-file ESLint, Prettier, and git diff --check passed.

A temporary mutant removed && runtime.isHydratingNow() from the late-commit condition in packages/db-sqlite-persistence-core/src/persisted.ts. The mutant queued the transaction after hydration closed. The focused browser test reached all timing flags, including a settled empty subset demand. Its updated-row poll then timed out with the old row in both public and durable state. This is an assertion timeout at the intended settled checkpoint, not a setup failure or an unreached path. The mutant was removed. The focused browser test passed again.

ORC-001 through ORC-011

RequirementOutcome
ORC-001: authority and limitsPass for the fixed #1754 live-host history. The issue supplies the reported begin/commit straddle. Existing core persistence tests and Collection sync settlement supply the law. This does not prove Firefox/Zen, eager startup, other mutation shapes, or arbitrary Electric fetch schedules.
ORC-002: independent judgmentPass. PostgreSQL fixture values define the old and new rows. Neither the Electric stream nor the persisted SQLite snapshot computes the expectation.
ORC-003: responsibilitiesPass. The spec states the contract, fixed history, public and durable checkpoints, and limits. Its named companion fixture drives the real source, hydration scope, and OPFS adapter.
ORC-004: generated grammarNot triggered. This is one fixed history with unique resource IDs, not a generated-history coverage claim.
ORC-005: production path and observationPass. The real Electric source calls the persisted wrapper. Reach flags prove begin during hydration and commit after scope exit. Exact public and durable rows are checked before release, after settlement, after leadership transfer, and after reopen.
ORC-006: calibrationPass. The old late-buffer decision left the original row in both observations at the intended checkpoint. The failure was an assertion poll timeout with every required timing flag reached.
ORC-007: fixed/random replayNot triggered. The test has no important generated property. Random IDs isolate resources, but do not generate semantic histories.
ORC-008: model minimalityNot triggered. The test adds no stateful reference model.
ORC-009: vocabularyPass. Hydration scope, source transaction, public rows, durable rows, and leadership use their production meanings. The test-only gates record timing and do not model product state.
ORC-010: failure fidelityPass for this harness. Cleanup releases both gates, closes the pages and database, and drops the PostgreSQL table. An AggregateError keeps the primary failure as its cause when cleanup also fails. Process termination remains outside this guarantee.
ORC-011: second formulationNot triggered. No shared semantic classifier between the fixed PostgreSQL expectation and the Electric/SQLite implementation was identified. Core controlled-adapter tests cover adjacent settlement orders at a different boundary.

ORC-012 is satisfied by this versioned record and the exact reviewed oracle commit. The bounded host witness does not by itself close every environment or history in #1754. The coverage map assigns adjacent settlement histories to the core persistence tests and names the remaining live-host limits.

Fixture failure-fidelity follow-up

  • Follow-up code commit: 7c149f25efb825d32e4ef65c42a3f1c458640724.
  • The accepted review findings were diagnostic, not production-code defects. The parked source commit now records the first failure and rethrows its applied receipt. A terminal probe failure stops the row poll immediately. Empty error messages receive a nonempty fallback, and page errors remain available to diagnostics after probe startup.
  • Before the change, a controlled probe of the exact fixture interceptor made params.commit throw and reject after release. Both receipts rejected, but the probe still reported phase: ready with no failure cause. After the change, both receipts still reject while the probe reports phase: failed and the original cause. An empty Error retains its name. The same probe showed a late page error missing from diagnostics before the change and present afterward.
  • Three focused Playwright checks cover empty failure messages, immediate reporting of a terminal commit failure, and page errors after startup. The terminal-failure check observes one failed row read and one fresh diagnostic read, rather than repeated row polling. The live Electric/OPFS straddle history passed two focused repeats; the full live suite passed 8 of 8 tests. Package TypeScript, changed-file ESLint, Prettier, and git diff --check passed.
  • No exactly-one row-bearing commit assertion was added. A second eligible commit can bypass the fixture's park, but no legal Electric trace has shown the exact old/new row assertions passing while the target update bypasses the intended straddle. A no-write commit is deliberately excluded. The per-poll resume snapshot remains unchanged: it is one full-row read per observation, but the one-row fixture has no demonstrated slow-host failure. These two questions remain limits of this fixed history, not evidence of product correctness bugs.